STATOR REWINDING IN A POWER STATION
In this project, we performed on-site measurements at the original Roebel bars in a power station; subsequently, we manufactured new bars by using the Resin-Rich technology and reinstalled the bars in the power station. In addition, the old stator winding was removed and a new one manufactured on the site and reinstalled.
Project key data
- GEC Alstom T190-240
- Power: 55 MVA
- Voltage: 5 kV
- Speed: 3,000 min-1